HIGH Introduced in 3.10
isert ControlComp UAF
CVE-2026-98357
CVSS:3.1/AV:N/AC:H/PR:N/UI:N/S:U/C:H/I:H/A:H
KernelScan AI7.5HIGH
01Description
In the Linux kernel, the following vulnerability has been resolved: IB/isert: wait for deferred control PDU completions before releasing the connection isert_send_done() hands ISTATE_SEND_TASKMGTRSP, ISTATE_SEND_REJECT and ISTATE_SEND_TEXTRSP completions off to isert_comp_wq and returns. The work item then runs isert_completion_put() -> isert_put_cmd(), which reads isert_conn->conn and takes conn->cmd_lock. Nothing orders that work item against teardown. isert_wait_conn() queues isert_release_work, which frees isert_conn, and iscsit_close_connection() frees the iscsit_conn right after it returns, so the queued work can run against freed memory. Count the deferred control PDU completions per connection and let isert_wait_conn() wait for them before the release work is queued. ISTATE_SEND_LOGOUTRSP is deliberately not counted: that branch runs iscsit_logout_post_handler(), which ends up waiting for conn->conn_wait_comp, and that completion is only sent by iscsit_close_connection() after it has called iscsit_wait_conn(). Waiting for it here would deadlock. Its wait stays the existing isert_wait4logout(). The splat below is from a kernel with tracing printk()s and an msleep(200) injected into isert_do_control_comp() to widen the window: BUG: KASAN: slab-use-after-free in isert_put_cmd+0x53d/0x620 Read of size 8 at addr ffff8881054f1038 by task kworker/u17:1/182 CPU: 0 UID: 0 PID: 182 Comm: kworker/u17:1 Tainted: G B 7.2.0-rc5-TWIDE-gb8babf08acc7 #1 PREEMPT(lazy) Tainted: [B]=BAD_PAGE Hardware name: QEMU Ubuntu 24.04 PC v2 (i440FX + PIIX, arch_caps fix, 1996), BIOS 1.16.3-debian-1.16.3-2 04/01/2014 Workqueue: isert_comp_wq isert_do_control_comp Call Trace: <TASK> dump_stack_lvl+0x53/0x70 print_report+0xd0/0x630 ? __pfx__raw_spin_lock_irqsave+0x10/0x10 ? _raw_spin_unlock_irqrestore+0x3e/0x70 ? isert_put_cmd+0x53d/0x620 kasan_report+0xce/0x100 ? isert_put_cmd+0x53d/0x620 isert_put_cmd+0x53d/0x620 ? isert_completion_put+0x305/0x330 ? isert_do_control_comp+0x2ef/0x310 process_one_work+0x633/0x1030 ? assign_work+0x11d/0x370 worker_thread+0x45b/0xd10 ? __pfx_worker_thread+0x10/0x10 ? __pfx_worker_thread+0x10/0x10 kthread+0x2c6/0x3b0 ? recalc_sigpending+0x15c/0x1e0 ? __pfx_kthread+0x10/0x10 ret_from_fork+0x36e/0x5a0 ? __pfx_ret_from_fork+0x10/0x10 ? __switch_to+0x572/0xdd0 ? __pfx_kthread+0x10/0x10 ret_from_fork_asm+0x1a/0x30 </TASK> Allocated by task 48: kasan_save_stack+0x33/0x60 kasan_save_track+0x14/0x30 __kasan_kmalloc+0x8f/0xa0 __kmalloc_cache_noprof+0x158/0x370 isert_cma_handler+0x1e3/0x2ae0 cma_cm_event_handler+0x3e/0x240 cma_ib_req_handler+0x17d9/0x4490 cm_process_work+0x41/0x330 cm_work_handler+0x5727/0xc160 process_one_work+0x633/0x1030 worker_thread+0x45b/0xd10 kthread+0x2c6/0x3b0 ret_from_fork+0x36e/0x5a0 ret_from_fork_asm+0x1a/0x30 Freed by task 184: kasan_save_stack+0x33/0x60 kasan_save_track+0x14/0x30 kasan_save_free_info+0x3b/0x60 __kasan_slab_free+0x43/0x70 kfree+0x121/0x380 iscsit_close_connection+0x7cf/0x1e60 iscsit_take_action_for_connection_exit+0x1b6/0x360 iscsi_target_tx_thread+0x472/0x690 kthread+0x2c6/0x3b0 ret_from_fork+0x36e/0x5a0 ret_from_fork_asm+0x1a/0x30
02KernelScan AI Analysis
Risk summary
A remote iSCSI initiator on the RDMA fabric can trigger a use-after-free in the iSER target driver by tearing down a connection while deferred control PDU completions are still pending. The race condition leads to kernel memory corruption, potentially crashing the host or enabling code execution. Systems running iSCSI/iSER targets exposed on an RDMA LAN are at risk.
Vulnerability analysis
The iSER target driver defers certain control PDU completions (task management responses, reject, and text responses) to a work queue. When the connection is torn down, the teardown path frees the connection structures without waiting for those deferred work items to finish, so the work item can dereference already-freed memory — a classic use-after-free. The fix adds a per-connection atomic counter that tracks outstanding deferred control completions and makes the connection teardown wait for all of them to drain before queuing the release work. An attacker who can connect to the iSER target over the RDMA fabric (InfiniBand or RoCE) can trigger this by initiating a connection close while control PDUs are still in flight; no special privileges are needed beyond the ability to establish an iSCSI session to the target.
Lifecycle
03Fix Versions
| Branch | Introduced | Fixed in | Patch commit |
|---|---|---|---|
| 5.10 | 3.10 | 5.10.271 | f5613acbe2e3 |
| 5.15 | 3.10 | 5.15.222 | ccdb1523f12b |
| 6.1 | 3.10 | 6.1.189 | 0e230917670c |
| 6.6 | 3.10 | 6.6.158 | 505b242d9351 |
| 6.12 | 3.10 | 6.12.112 | 7edb8a88d6c7 |
| 6.18 | 3.10 | 6.18.54 | b96b8b3e41c3 |
| 7.2 | 3.10 | 7.2.8 | 7908fbc597a6 |
| mainline | 3.10 | 7.3-rc4 | a8fe3dfce8c0 |